Lake Ainsworth South Eastern Precinct Project
Ballina (Area) 3 Sep 2018

The road closure of the eastern road precinct will comprise water main relocation followed by path construction and landscaping. The path will be completed in sections to ensure the space is still accessible and usable for pedestrians.

Other works will include:

closure of the Lake Ainsworth eastern road to vehicles 3m wide accessible pathway BBQ facilities and picnic areas sandstone block seats amongst open spaces increased grassed areas improved stormwater quality management systems restoration and revegetation of the eroded foreshore areas.

Budget:  $880,000 including Stage 3. Anticipated timeline: February - June 2019